After Unit 1 + 2, for the rehabilitation of a power plant in Turkey, the 8 burner stations for Unit 3 have now also been successfully accepted by the customer.
In addition to the 8 burner stations for heavy oil and steam in high pressure design (PN100), the scope of delivery also includes:
– Oil measuring and control station for supply and return line.
– Ignition gas take-over station.
Engineering, production, assembly and testing were carried out exclusively at the Bochum location.